Communication History in High Definition

Sponsored by LG Electronics USA, Inc.
Type: Case Study
Overview | Download

The Cable Center wanted to replace its video wall with a new, high-definition video wall in time for the Democratic National Convention. LG Electronics and National Network Services were chosen to handle the installation. The installation included: 

  • Creating a new, solid-iron frame to house the video wall
  • Ensuring proper cooling and ventilation
  • Safely installing 44 47-inch LCD HDTVs
  • Enough flexibility that new technology can be incorporated as needed.

Now, The Cable Center offers visitors an innovative way to share video and information.