Philadelphia International Airport completes facility-wide upgrade with NEC LCD displays

Sponsored by NEC Display Solutions
Sponsored by: NEC Display Solutions
Type: Case Study
Overview | Download

When PHL required an update to its CRT displays, Arora stepped in to help ease the transition process. The City of Philadelphia provided Arora with a list of requirements for the new installation. Its highest priority was a 3-year on-site warranty, a rigorous but
extremely necessary prerequisite given its commercial application.

Learn how they met the needs of very difficult challenges, including:

  • Airport-Wide Technology Integration
  • Software Upgrades
  • Building an infrastructure that was accepting of future technology